ISTech Support Forum
http://www.istechforum.com/YaBB.pl
Evo-ERP and DBA Classic >> Manufacturing >> Problems with swap substitute part
http://www.istechforum.com/YaBB.pl?num=1073922855

Message started by Karen Mason on 01/12/04 at 07:54:15

Title: Problems with swap substitute part
Post by Karen Mason on 01/12/04 at 07:54:15

I am not sure if my procedure is incorrect or if there is a programming logic problem.

I use swap subtitute parts in the work order module quite often.  Usually, the item I am substituting is not on the swap substitute part list.  I get a message that asks if this is okay.  I answer yes.  Then in the quantity of the original material, I enter 0(zero).   The material in the work order shows only the substitute item.

However, when I run MRP, a planned order is generated for the part I am manufacturing for a customer order and for the orginal material even though I already have a work order in existence for that part.  

It is not a case of an additional order being placed by the customer.  There is only one requirement.

I don't believe this was happening before but I'm not sure, as I have not been using the MRP for long.  Anyone else having this problem or know a solution?

Title: Re: Problems with swap substitute part
Post by aricon on 01/12/04 at 10:26:22

The "problem" is that the MRP functionality looks at BKBMMSTR (the BoM master file) and then looks at WOBOM (the WO BoM file) so both requirements get represented.

Title: Re: Problems with swap substitute part
Post by Lynn_Pantic on 01/12/04 at 12:24:46

Not if the work order already exists - in that case it should be only looking at the WOBOM.  Let me see if I can duplicate what you describe, it could be a problem with the sap substitute program.

Title: Re: Problems with swap substitute part
Post by aricon on 01/12/04 at 13:24:08

Lynn,

Tried it before I wrote it. She is right. And that is how I drew the conclusion.

Title: Re: Problems with swap substitute part
Post by Lynn_Pantic on 01/12/04 at 15:22:16

Then it is a problem because it shouldn't   :o  Let me see why it is.  It should only be looking at the master BOM if the WO doesn't exist or if it is status S meaning it has no WOBOM.  We have MRP on the programming table this month, one more for the pile!

Title: Re: Problems with swap substitute part
Post by aricon on 01/12/04 at 18:55:05

Sounds like....a plan! ;D

ISTech Support Forum » Powered by YaBB 2.1!
YaBB © 2000-2005. All Rights Reserved.