Message started by shadowcaster on 02/18/04 at 15:20:41

Title: Routing cost actual cost power tool needed
Post by shadowcaster on 02/18/04 at 15:20:41

Ok heres what I need to do

I have over 3000 of type A items many with standard cost that are not in tune with actual cost  I need to generate a report /spreadsheet that shows part number and the actual cost of each routing and the portion of the standard cost in that routing. So I know what routings to correct and by how much.

Is there such a thing, could I do this in Access?  Where is the job cost data stored?

Its getting old having to do a job cost on each item and try to back figure dollars, time ect. to correct the standard cost on each item. I need a POWER Tool for this job.

JW


Title: Re: Routing cost actual cost power tool needed
Post by Lynn Pantic on 02/18/04 at 18:34:06

Is it the Labor time standards that need to be updated?  JC-H (IS Tech Version) has the ability to update the Routing Standards based on the actual labor reported.   See if that will help.

Title: Re: Routing cost actual cost power tool needed
Post by shadowcaster on 02/19/04 at 13:41:06

Thanks That's close
Very nice too I didn't know that was in there.

If the part number was repeated on the line with each record it would be mucho better because I could them import the data into access and calculate what ones are realistic based on the existing standard and what ones have junk in them.

is there a source  I can lookat for that report ?  
so I can see where the data comes from ?

then I can just ODBC it into access

JW

Title: Re: Routing cost actual cost power tool needed
Post by aricon on 02/19/04 at 13:54:14

Actual labor is in WOLABOR (or WOHLABOR if you have archived WOs) and the standards are in ROUTING.

Title: Re: Routing cost actual cost power tool needed
Post by shadowcaster on 02/19/04 at 14:44:08

Lorne

Thanks for pointing me in the right direction.
I get lost in these tables

Dam it  Jim I'm a surgeon not a brick layer.  (Star trek Reference)


JW


Title: Re: Routing cost actual cost power tool needed
Post by aricon on 02/19/04 at 15:39:29

Can't remember the field name in ROUTING, but the labor field in WOLABOR is EST_LAB for estimated, and ACT_LAB for actual reported.