ISTech Support Forum
http://www.istechforum.com/YaBB.pl
Evo-ERP and DBA Classic >> Manufacturing >> Materials in WIP but not shown in IN-A
http://www.istechforum.com/YaBB.pl?num=1082583350

Message started by mwee on 04/21/04 at 13:35:50

Title: Materials in WIP but not shown in IN-A
Post by mwee on 04/21/04 at 13:35:50

Materials in WIP shown 100% in JC-P but not Shown in IN-A. Some of the Workorder WIP 100 % but not Shown in IN-A. Any body know How to ........
Thanks ;D

Title: Re: Materials in WIP but not shown in IN-A
Post by lmk223a on 04/22/04 at 05:49:44

If the work order is 100% complete, was an entry made to finished goods (which will move the investment from WIP to finished goods inventory which then can be viewed in IN-A)?  Was the work order closed?

Title: Re: Materials in WIP but not shown in IN-A
Post by mwee on 04/23/04 at 05:43:25

Thanks, I found out Upper Level WIP are Not Shown in IN-A but material issued is shown in IN-A

ISTech Support Forum » Powered by YaBB 2.1!
YaBB © 2000-2005. All Rights Reserved.