ISTech Support Forum
http://www.istechforum.com/YaBB.pl Evo-ERP and DBA Classic >> Manufacturing >> Materials in WIP but not shown in IN-A http://www.istechforum.com/YaBB.pl?num=1082583350 Message started by mwee on 04/21/04 at 13:35:50 |
Title: Materials in WIP but not shown in IN-A Post by mwee on 04/21/04 at 13:35:50 Materials in WIP shown 100% in JC-P but not Shown in IN-A. Some of the Workorder WIP 100 % but not Shown in IN-A. Any body know How to ........ Thanks ;D |
Title: Re: Materials in WIP but not shown in IN-A Post by lmk223a on 04/22/04 at 05:49:44 If the work order is 100% complete, was an entry made to finished goods (which will move the investment from WIP to finished goods inventory which then can be viewed in IN-A)? Was the work order closed? |
Title: Re: Materials in WIP but not shown in IN-A Post by mwee on 04/23/04 at 05:43:25 Thanks, I found out Upper Level WIP are Not Shown in IN-A but material issued is shown in IN-A |
ISTech Support Forum » Powered by YaBB 2.1! YaBB © 2000-2005. All Rights Reserved. |