Title: Standard Cost Post by Juan on 03/31/09 at 15:04:25 In the report Costed Bil Of Material at the end of the report , the report has the total for all the components, and it add Incremental Cost for Parent. What is incremental cost for parent? Thx |
Title: Re: Standard Cost Post by Lynn_Pantic on 03/31/09 at 18:12:15 Typically it will be Labor and Outside processing associated with the Routing for the parent part. |
Title: Re: Standard Cost Post by Juan on 04/01/09 at 05:22:48 There's something wrong with the report I check a cable assembly type M we send the connectors and cable and pay $.85 to put it together, but the incremental cost is 0, why? and in others this cost is over stated Thx |
Title: Re: Standard Cost Post by Lynn_Pantic on 04/01/09 at 12:05:47 On a type M part, the Incremental cost would be what you pay for the outside service and it needs to be entered manually in IN-L-A or IN-B Standard Cost screen and rolled up and saved. |
Title: Re: Standard Cost Post by Juan on 04/01/09 at 12:47:04 So were is the system getting the information that is on the report? we have not enter a cost for the outside on the items that I checked Thx |
Title: Re: Standard Cost Post by Lynn_Pantic on 04/01/09 at 13:34:03 If they are make from items, then somebody entered it. Unless the parts used to be a different type and have a routing. It has to be one or the other. |
Title: Re: Standard Cost Post by Juan on 04/01/09 at 13:48:13 I know nobody entered, because that would have been me. The may have been type A, but we do not track labor. We do not have labor cost in DBA, only outside procesing Thx |