ISTech Support Forum
http://www.istechforum.com/YaBB.pl Evo-ERP and DBA Classic >> Manufacturing >> Updated Stnd Cost Not Accurate in Estimate http://www.istechforum.com/YaBB.pl?num=1291232005 Message started by skgofokc on 12/01/10 at 12:33:25 |
Title: Updated Stnd Cost Not Accurate in Estimate Post by skgofokc on 12/01/10 at 12:33:25 DBA Classic Version 2004.1 with IS Tech Update 12/21/08 I updated material cost on an item to get current cost for a new estimate. The updated cost was not reflected in the estimate. Additionally, on another part number I entered a cost for a larger quantity of material in ES-H and in turn it was not reflected in an estimate. Thanks, Sheryl |
ISTech Support Forum » Powered by YaBB 2.1! YaBB © 2000-2005. All Rights Reserved. |