Post by GoodNatureProducts on 05/11/15 at 10:51:19

I have a part that was bought from the outside and we have a $$ amount in the outside proc field, we now just buy the material and assemble the part. My Material cost field is correct but I cant make the outside proc = 0.

It will not let me change it in IN-B or IN-L-A

thanks

Title: Re: Change Cost
Post by Vman on 05/12/15 at 09:43:11

Try UT-A FIXSTD.RUN.