ASM
Full Member
 

The Guitarman...
Posts: 142
Gender:
|
Hi, I beleive I might have found a new bug in Finished production costing. When an employee logs into multiple WO's simultaneously then closes them all at the same time the OVERHEAD costs are not divided out like the Labor is. The estimated totals are ok but the actual costs are way out of wack. Is this a bug or I'm I doing something wrong. I'm using ver. 2002.4 5/23/03. Thanks Jim P
|