Karen Mason
|
I am not sure if my procedure is incorrect or if there is a programming logic problem. I use swap subtitute parts in the work order module quite often. Usually, the item I am substituting is not on the swap substitute part list. I get a message that asks if this is okay. I answer yes. Then in the quantity of the original material, I enter 0(zero). The material in the work order shows only the substitute item. However, when I run MRP, a planned order is generated for the part I am manufacturing for a customer order and for the orginal material even though I already have a work order in existence for that part. It is not a case of an additional order being placed by the customer. There is only one requirement. I don't believe this was happening before but I'm not sure, as I have not been using the MRP for long. Anyone else having this problem or know a solution?
|