travelers with subparts? Parent/component (Read 788 times)
Laura  D. Oliver
Active Member
*****




Posts: 985
Gender: female
travelers with subparts? Parent/component
04/22/04 at 11:13:52
 
Hypothetically.....I want to make dumbells.
1. Could I enter parts like this:
 .                 DUMBELL   type F  
 .                      SHAFT  type A
 .                 WEIGHT  type A
 
2. enter  routings  
3.  enter a BOM with DUMBELL as the parent and have SHAFT and WEIGHT as the components
3.  add just the part DUMBELL to my Sales Order
4.  Convert SO to WO
5.  print travlers for both the SHAFT and the WEIGHT
6.  job cost just the WEIGHT   or   just the SHAFT
7.  produce Cusomter an invoice that just shows BARBELL
 
I can't get to #5.  But then DBA will produce only 1 traveler for DUMBELL and lists SHAFT and WEIGHT at the bottom.  I want a traveler for each sub part.
 
What am I doing wrong?
 
Until now (7yrs) everything we have sold has been a part F.
 
Thanks,
Laura
 
 
 
 
 
Back to top
 
 

Laura D. Oliver
classic DBA since 1997
EVO on Amazon server as of 5-2022
DIXIE PRECISION INC.
Birmingham, Alabama
(205)- 841-8400

www.dixieprecision.com



Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: travelers with subparts? Parent/component
Reply #1 - 04/22/04 at 12:11:26
 
When you convert SO to WO you need to say Y to create Multi Assy work orders.  That will create the -1 work order for the Dumbell and -2 and -3 for the weight and shaft.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
Laura  D. Oliver
Active Member
*****




Posts: 985
Gender: female
Re: travelers with subparts? Parent/component
Reply #2 - 04/22/04 at 12:42:09
 
cha-ching!!!
 
Where would you post assembly time?
My guy thinks you would post it to WO XXXX-1 DUMBELL
Is that correct?
Thanks
Laura
Back to top
 
 

Laura D. Oliver
classic DBA since 1997
EVO on Amazon server as of 5-2022
DIXIE PRECISION INC.
Birmingham, Alabama
(205)- 841-8400

www.dixieprecision.com



Email WWW   IP Logged
aricon
Active Member
*****


Systems
Consulting-See
website for
products!

Posts: 1283
Gender: male
Re: travelers with subparts? Parent/component
Reply #3 - 04/22/04 at 12:47:42
 
You post labor to each work order individually as required. So if there is work on the shaft you will be able to Job Cost the shaft assembly separate from the weight assembly.
 
If you then want to job cost the whole thing there is a check field in JC-A for "Print Composite report" and you would select all 3 work orders at the from/thru range. For the other JC reports just select all 3 work orders and you can get composite costing.
Back to top
 
 

Sincerely,

Lorne Rogers
President
Aria Consulting & Implementers Ltd.
Phone: (780) 471-1430
Fax: (780) 471-4918
E-mail: lrogers@ariaconsulting.net
Email WWW   IP Logged
Laura  D. Oliver
Active Member
*****




Posts: 985
Gender: female
Re: travelers with subparts? Parent/component
Reply #4 - 04/22/04 at 12:54:43
 
But if I wanted to weld  the WEIGHT to the Shaft ...(and have a completed DUMBELL)...where would I post the wedling time?  
 
Remember my BOM looks like this:
.  
 .       DUMBELL   type F    
 .       SHAFT  type A  
 .       WEIGHT  type A  
 
Under what part# should the sequence for assembly (including welding) be found?
 
Back to top
 
 

Laura D. Oliver
classic DBA since 1997
EVO on Amazon server as of 5-2022
DIXIE PRECISION INC.
Birmingham, Alabama
(205)- 841-8400

www.dixieprecision.com



Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: travelers with subparts? Parent/component
Reply #5 - 04/22/04 at 13:01:25
 
Putting it all together would belong to the Dumbbell work order.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
cathyh
Active Member
*****


I used to be
indecisive; now I'm
not so sure......

Posts: 1210
Gender: female
Re: travelers with subparts? Parent/component
Reply #6 - 04/23/04 at 08:01:44
 
When we make F type parts that have A types in the BOM, we make work orders for both F and A and finish production on the A type when all costs are collected, and then issue them to the F type. Then the A costs are included in the cost for the F type.
Back to top
 
 

Cathy Hamilton
Wing Inflatables, Inc.
EVO-ERP2008.1(20 users) w/IS Tech update 5/25/09 (as of 08/21/09)