Lynn_Pantic
Administrator
   

evolution (n) - gradual change to a different form
Posts: 5663
|
WO-M and Data Collection were actually fixed to correct a long standing problem but I suspect you are seeing a ripple effect of this fix. If a routing sequence is flagged Y for Standard Time, WO-F has always calculated a time based on the quantity of parts completed and the labor standard (time per part). This is by design and WO-M and DC were recently fixed to work the same way. However, this means that if your sequences are all coded for Standard Time and you aren't entering a quantity complete, you will see exactly what you are describing. You need to use UT-K-B on the ROUTING, WOROUT and ROUTTEMP files and change the STD.TIME field from Y to N so you can enter actual times.
|