Welcome, Guest. Please Login.
05/10/25 at 07:44:58
News:
Home Help Search Login


Pages: 1
Send Topic Print
WO-I closing wo does not show variance (Read 640 times)
iliadmin
Browser
*


DBA for Linux!

Posts: 25
Gender: female
WO-I closing wo does not show variance
07/29/04 at 10:01:03
 
When we close a WO using WO-I, the wip variance no longer shows up.  It does if we use WO-J (just tested), but production always uses WO-I.  This is under the classic DBA or Evo.  We do not have the 7/21 update applied yet--would that fix this?
 
Val
Back to top
 
 

Val
Evo-ERP 2005.1 with 5/17/05 updates
WWW   IP Logged
Karen Mason
Active Member
*****


Ain't life grand!?!

Posts: 728
Gender: female
Re: WO-I closing wo does not show variance
Reply #1 - 07/29/04 at 10:08:48
 
Maybe your work order default was accidentally changed?  (system manager  SD-B)
Back to top
 
 

Karen Mason, Vice President
Bula Forge & Machine, Inc.
1-60# forgings, machining, & assembly
Cleveland, OH
Tel:216-252-7600 Fax:216-252-7601 www.bulaforge.com
EVO-ERP 09/16/09 SP2
Email WWW   IP Logged
iliadmin
Browser
*


DBA for Linux!

Posts: 25
Gender: female
Re: WO-I closing wo does not show variance
Reply #2 - 07/29/04 at 10:10:11
 
DAH!  No I found it.  Have to turn it on SD-Q.
 
Val
Back to top
 
 

Val
Evo-ERP 2005.1 with 5/17/05 updates
WWW   IP Logged
pcorey
Browser
*


I love YaBB 1G -
SP1!

Posts: 4
Re: WO-I closing wo does not show variance
Reply #3 - 08/03/04 at 10:14:53
 
Hi,
 
We are still having the same issue after setting our system flags in SD-Q as follows:
 
 Check Comp at Fin Prod    Y
 Process WIP Variance in WO-J  Y
 Check if Qty per SEQ                Y
 Incl FP scrap in cost of goods   Y
 
 In the prior version we were on the wip variance  
 amount would show on the screen in Mfg WO-I,
 in version 2002.4 it doesn't come up.  Is this a system  
 flag set up or doesn't 2002.4 show the variance in
 MFG WO-I?
 
Pat
Back to top
 
 
  IP Logged
Laurie
Browser
*


Peace & Joy

Posts: 6
Gender: female
Re: WO-I closing wo does not show variance
Reply #4 - 11/11/04 at 08:46:19
 
According to my materials manager, he says the same thing.  I am having him print a WO receipt (JC-Q) to verify wip variance.  However, it would be helpful if the information appeared on the screen at the time finished production was entered to identify problems right away.  
Was this a change in any of the recent updates?
Back to top
 
 
  IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: WO-I closing wo does not show variance
Reply #5 - 11/11/04 at 18:41:15
 
Not an intentional one but let me take a look.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
Pages: 1
Send Topic Print