SH-N Generate Lead Times (Inaccurate?)
12/22/04 at 11:18:10
 
I have set up a routing with Lot Size of 1 and ALL operation times to be 15 minutes, zero queue time, zero set up time.
 
So for 8 operations, the lead time should simply be 8 times 0.25 hours which is 2 hours.
 
In running SH-N Generate Lead Times, for the above example with 8 operations, the lead time is 8 (days).  I also found that if I had 4 operations the lead time was 4, with 6 operations the lead time was 6.
 
From this I deduced that the system was allowing a MINIMUM of 1 day lead time for every operation.
 
I got the same results whether I was in DBA standard or DBA-ISTech.  I also found that SH-M Estimate Lead Times, was giving accurate results.
 
With my client, we have an average of 4 operations per component with short operation times, and can fill rush orders in less than one day.  So our solution right now is to manually enter lead times, but we would prefer to be able to use system generated lead times.
 
Does anyone have any comments or advice?
Back to top
 
 

John Mannion
Alba Consulting
www.albaca.com
Email WWW   IP Logged
Tim Keating
Senior Member
****


DBA CLASSIC WIN 2000
C/S

Posts: 298
Re: SH-N Generate Lead Times (Inaccurate?)
Reply #1 - 12/22/04 at 12:27:12
 
I agree that this is a problem.  I checked all queue times and they are set to zero so this is not the problem.
 
I'd like this to be fixed if possible.
Back to top
 
 

Tim Keating
Motor Guard Corporation
Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: SH-N Generate Lead Times (Inaccurate?)
Reply #2 - 12/22/04 at 17:31:10
 
I thought I had tested this and couldn't duplicate it but I just created a new part number and gave it a 4 sequence routing each with 15 minutes and I confirm it uses 1 day per sequence.  Will send to programming.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
JAM1967
Browser
*


I love YaBB 1G -
SP1!

Posts: 47
Re: SH-N Generate Lead Times (Inaccurate?)
Reply #3 - 12/22/04 at 19:47:04
 
Thanks Tim and thanks Lynn.