Welcome, Guest. Please Login.
05/10/25 at 12:53:41
News:
Home Help Search Login


Pages: 1 2 
Send Topic Print
wip summary (Read 2658 times)
p masters
Member
**




Posts: 57
wip summary
01/14/05 at 06:45:03
 
Am I correct in thinking, with the enhancement for JC-M dated 11/21/03, the wip summary should equal wip gl account for any given date??
 
Thank you for you help..
Pam
 
Back to top
 
« Last Edit: 01/16/05 at 13:00:48 by p masters »  
Email   IP Logged
Karen Mason
Active Member
*****


Ain't life grand!?!

Posts: 728
Gender: female
Re: wip summary
Reply #1 - 01/14/05 at 15:02:52
 
That's how I balance my WIP.
 
FYI: Sometimes the amounts written off to COGS are too much or too little.  If they make a significant impact on the bottom line, I use a journal entry to post the "should be" amount.  Then I reverse it when I close.  You need to add or subtract this amount manually from the JC-M total.
Back to top
 
 

Karen Mason, Vice President
Bula Forge & Machine, Inc.
1-60# forgings, machining, & assembly
Cleveland, OH
Tel:216-252-7600 Fax:216-252-7601 www.bulaforge.com
EVO-ERP 09/16/09 SP2
Email WWW   IP Logged
lmk223a
Senior Member
****


Accountant

Posts: 377
Re: wip summary
Reply #2 - 01/17/05 at 06:11:01
 
Since our management prefers to separate WIP $ by components of material, labor and load, we use JC-P for material $; manually track labor $ using a beginning balance, adding JC-C (labor) for the month, and subtracting labor associated with units transferred to finished production; then loads are calculated as a % of labor $.
 
We are unable to find one report in DBA to provide  monthend WIP by these 3 individual components.  JC-M only provides one number for monthend WIP and does not allocate it among these 3 components.
Back to top
 
« Last Edit: 01/18/05 at 06:03:18 by lmk223a »  

EVO/ERP 2007.2 3/2708 update, 15 users
Linda Kucan
Email   IP Logged
p masters
Member
**




Posts: 57
Re: wip summary
Reply #3 - 01/17/05 at 07:39:46
 
thanks Karen, we consistently have a problem with wip summary JC-M not matching the gl,  I'm not sure where we are going wrong.  
 
 
JC-M does have totals for labor, material etc....
Back to top
 
 
Email   IP Logged
cathyh
Active Member
*****


I used to be
indecisive; now I'm
not so sure......

Posts: 1210
Gender: female
Re: wip summary
Reply #4 - 01/19/05 at 08:18:35
 
We have some class codes that direct costs for certain product codes to expense accounts instead of wip( for instance, R&D)  The wip summary shows the amount for the work order in the totals, but the GL account doesn't have the costs included.  We have to be sure to subtract these work orders from the wip summary before we compare totals. Does your company build any work orders for product codes whose costs are not collected in your gl account for wip?
The wip summary does have columns for labor and overhead and materials.  As long as none of the work orders have any finished production, these column totals should accurately reflect the totals for labor and materials that are in wip.
A while back we made the first adjustment to WIP GL to match our wip report, and since then the only time we have more than minor differences is when we do something that just doesn't work like finish production with a negative number on a reopened work order.  This correctly debits the wip gl but puts a negative number in the wip summary.
Just a couple of things to think about...
Back to top
 
 

Cathy Hamilton
Wing Inflatables, Inc.
EVO-ERP2008.1(20 users) w/IS Tech update 5/25/09 (as of 08/21/09)
Windows 2008 Server/client
Pervasive V10.1
Email WWW   IP Logged
Karen Mason
Active Member
*****


Ain't life grand!?!

Posts: 728
Gender: female
Re: wip summary
Reply #5 - 01/19/05 at 09:10:45
 
...or sometimes if you close a workorder without a date, it will cause WIP not to balance
Back to top
 
 

Karen Mason, Vice President
Bula Forge & Machine, Inc.
1-60# forgings, machining, & assembly
Cleveland, OH
Tel:216-252-7600 Fax:216-252-7601 www.bulaforge.com
EVO-ERP 09/16/09 SP2
Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: wip summary
Reply #6 - 01/21/05 at 15:48:13
 
Karen - I don't think you CAN close a WO without a date.  If you can, tell me how you did it so I can prevent it.  Shouldn't be able to.
 
Cathy - if you make your work orders that post to expense accounts Status I (for Indirect) they can be easily excluded from the WIP Summary report.  They will also make no variance posting when they are closed because the system assumes status I work orders are for recording expense items and will not have Finished Production and consequently will also not have a Variance.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
Karen Mason
Active Member
*****


Ain't life grand!?!

Posts: 728
Gender: female
Re: wip summary
Reply #7 - 01/24/05 at 05:22:13
 
Lynn,
WO-J.  If you are a little too quick with the F10 (save) and do not go through the date field it records as 00/00/00.  This throws off reports when using an "as of" date.
Back to top
 
 

Karen Mason, Vice President
Bula Forge & Machine, Inc.
1-60# forgings, machining, & assembly
Cleveland, OH
Tel:216-252-7600 Fax:216-252-7601 www.bulaforge.com
EVO-ERP 09/16/09 SP2
Email WWW   IP Logged
cathyh
Active Member
*****


I used to be
indecisive; now I'm
not so sure......

Posts: 1210
Gender: female
Re: wip summary
Reply #8 - 01/24/05 at 08:19:31
 
Thank you Lynn!  Everyone around here thinks I know all there is to know about DBA and with the help of you and IS Tech support, and all the forum members I don't really need to set them straight!  I have been struggling with "indirect" work orders for a long time and with one keystroke the problem is solved. I feel  Tongue but I'm very  Grin
Back to top
 
 

Cathy Hamilton
Wing Inflatables, Inc.
EVO-ERP2008.1(20 users) w/IS Tech update 5/25/09 (as of 08/21/09)
Windows 2008 Server/client
Pervasive V10.1
Email WWW   IP Logged
p masters
Member
**




Posts: 57
Re: wip summary
Reply #9 - 01/25/05 at 10:25:13
 
thank you for your thoughts, we will be able to use the indirect status as well.
 
I am noticing that when I print JC-M using a prior date, the actual finish dates fill in for the day after the prior date to the current date....each time I print a few days later the $ amount changes, it looks like it omits any work orders closed after the prior date... it this the way it is supposed to work?? ???
Back to top
 
 
Email   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: wip summary
Reply #10 - 01/25/05 at 15:27:18
 
It should be including the transactions through the as of data on open work orders plus transactions through that date on work orders now closed that were open as of that date.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
lmk223a
Senior Member
****


Accountant

Posts: 377
Re: wip summary
Reply #11 - 01/26/05 at 05:57:31
 
question to cathyh:  
 
We set up an indirect work order for Engineering of multiple prototypes.  For Status "I" Indirect work orders: what quantity, if any, do you use when creating your indirect work orders for Research?  Since finished production is not going to be entered (since this is chargeable to an expense account) can a quantity of 0 be used or should "1" be used???    Please advise.
 
 
Back to top
 
 

EVO/ERP 2007.2 3/2708 update, 15 users
Linda Kucan
Email   IP Logged
cathyh
Active Member
*****


I used to be
indecisive; now I'm
not so sure......

Posts: 1210
Gender: female
Re: wip summary
Reply #12 - 01/26/05 at 08:09:26
 
WE set the quantity to one, and we do finish production and close at the end of each month.  
Here is an example: We have a part number R&D with a class code R&D.  The class code has the same expense account for R&D in asset, COGS, and WIP account codes.  We have an absorbed labor account for R&D and this account is in all the absorbed labor accounts for the class code.   We build a work order for R&D ( a type N part) for quantity 1. WE issue materials, issue labor all month long. The costs are collected in "WIP"  which is the expense account for R&D.  When we finish and close at the end of the month we do it at actual cost.  The $$ go in and out( in asset out WIP, out asset in COGS for a net change of $0) and  since the part is an N type, there is no inventory to manage.  The costs, both labor and parts have been collected in the R&D expense account, and the absorbed labor has reduced the direct, variable, and fixed  labor costs, which are in  R&D expense.
We have a work order every month for general R&D expense, and sometime make a particular work order for a particular project.  WE use the same part number R&D(type N), we can fill in the description, and can even enter a routing and BOM.  
Hope thiis helps.
Back to top
 
 

Cathy Hamilton
Wing Inflatables, Inc.
EVO-ERP2008.1(20 users) w/IS Tech update 5/25/09 (as of 08/21/09)
Windows 2008 Server/client
Pervasive V10.1
Email WWW   IP Logged
lmk223a
Senior Member
****


Accountant

Posts: 377
Re: wip summary
Reply #13 - 01/26/05 at 10:38:52
 
Thanks for your prompt reply and explanation.
 
We are new to implementing type "I" orders as we always used status "R" for everything.  The forum has really helped educate us in DBA.  
 
Thanks to everyone! Cheesy
Back to top
 
 

EVO/ERP 2007.2 3/2708 update, 15 users
Linda Kucan
Email   IP Logged
cathyh
Active Member
*****


I used to be
indecisive; now I'm
not so sure......

Posts: 1210
Gender: female
Re: wip summary
Reply #14 - 01/26/05 at 12:19:14
 
While we have been using indirect work orders for some time, we are just now using the correct type for the work order!
This forum is really a great help, and I don't know how I got along with out it before!
Back to top
 
 

Cathy Hamilton
Wing Inflatables, Inc.
EVO-ERP2008.1(20 users) w/IS Tech update 5/25/09 (as of 08/21/09)
Windows 2008 Server/client
Pervasive V10.1
Email WWW   IP Logged
Pages: 1 2 
Send Topic Print