02/11/05 at 08:00:43
 
We build electronic parts.  Every time we revise a circuit board, we need a new milled part called a stencil.
 
The tool is needed, but not consumed during manufacturing.  They last forever. Smiley
 
Can we get the requirement to buy a stencil into DBA the following way:  
    Enter Item for the Stencil.
    Add to the master Bill of Materials with 0 quantity.
    Change the first work order's BOM  with the  
    quantity (1/lot size)?
 
Is there a better way?   ???
Back to top
 
 
WWW   IP Logged
aricon
Active Member
*****


Systems
Consulting-See
website for
products!

Posts: 1283
Gender: male
Re: Requirement for Tooling
Reply #1 - 02/11/05 at 08:37:54
 
Depends, do you need to keep track of them afterwards? Do you need to see how many you have, etc? If not, you could enter it as a non-stock and consume it against the job as you indicated. If you DO need to keep track, then you would need to make it a stocked item and do an additional transaction after the job to adjust it back into inventory.
Back to top
 
 

Sincerely,

Lorne Rogers
President
Aria Consulting & Implementers Ltd.
Phone: (780) 471-1430
Fax: (780) 471-4918
E-mail: lrogers@ariaconsulting.net
Email WWW   IP Logged
sharon krewson
Ex Member



Re: Requirement for Tooling
Reply #2 - 02/11/05 at 09:16:09
 
Jay
 
We are in the same industry.  We are a contract manufacturer and our customers pay for the stencils.  We had to come up with a way to track when we need the stencil and make sure we charge our customer only once (or at all).  This is what we came up with.
 
Create a type R part for the stencil.
Add the stencil to the BOM at 0 qty.
The stencil is added to the Sales Order.  
Once the part is on a sales order it is showing demand and drives the stencil guy to order it.  
Once it is received it is assigned a location and we have 1 on hand.
When we ship the first order off that stencil it is added to the pack list and invoiced.  
The qty on hand goes to 0 but we now have a receipt history and a location to show that we actually have it.  
The stencil appears on the traveler along with it's location.
We don't repeat stencil numbers (order more than once).
 
Hope this helps.
Back to top
 
 
  IP Logged
Karen Mason
Active Member
*****


Ain't life grand!?!

Posts: 728
Gender: female
Re: Requirement for Tooling
Reply #3 - 02/11/05 at 09:56:20
 
We require tools (dies) also.  We usually charge a one-time charge to the customer.  However, we need to maintain the tools which can be a major undertaking.  We assign a P/N with the same base # as the part and add DIE or FIXT, ie: 5601DIE.  We also add to the BOM with a qty .0001.  It's either good or not.  If I have to repair the tools, then I bring inventory to 0 and it shows a shortage.  I create work orders for the die repairs and accumulate costs.
Back to top
 
 

Karen Mason, Vice President
Bula Forge & Machine, Inc.
1-60# forgings, machining, & assembly
Cleveland, OH
Tel:216-252-7600 Fax:216-252-7601 www.bulaforge.com
EVO-ERP 09/16/09 SP2
Email WWW   IP Logged
wildco
Full Member
***


I love YaBB 1G -
SP1!

Posts: 174
Re: Requirement for Tooling
Reply #4 - 02/11/05 at 11:32:33
 
We assign all our tooling part numbers and code them as type "N"  This allows them to print on each work order with bin locations, etc without worrying about stocking in inventory.  You can invoice for type N parts also.
Back to top
 
 

Aaron

2004.1 with ISTECH 1/12/06
  IP Logged
lmk223a
Senior Member
****


Accountant

Posts: 377
Re: Requirement for Tooling
Reply #5 - 02/14/05 at 06:14:00
 
We also are in the circuit board mfg industry.  We use a part number called "PASTE STENCIL"  coded as a type "N" for noninventory, but classed as "TL" for tooling such that it charges Cost of Goods Sold when received from the vendor, and the end-user customer is billed separately on the sales order for this item as "TOOLING" (another noninventory part number)  
 
We did not want to put it on the BOM, because this would add its cost to the work order cost for the manufacture of the customer's part number.  As we do not want tooling costs in the inventory item, and since most of our customers reorder from us, we wanted to separate the tooling cost from the inventory cost for the part number.   As future work orders would not require the paste stencil again unless there is a revision.
Back to top
 
 

EVO/ERP 2007.2 3/2708 update, 15 users
Linda Kucan
Email   IP Logged
JaySchmitendorf
Browser
*


EVO-ERP, Electronic
Assembly Contract
Manufacturer

Posts: 31
Gender: male
Re: Requirement for Tooling
Reply #6 - 03/03/05 at 15:11:18
 
Thank you very much Smiley