lmk223a
|
We post sales the day AFTER shipment is made. This provides for entering labor to the work order for the day of the shipment as sometimes things are worked on the same day they ship, and the act of releasing packing slips does not require finished production to be entered. After labor is entered, we verify all material is issued to the work order, then enter finished production. In SO-G, posting invoices, COGS are checked in the pre-post report before effectuating the final post. This provides for correcting COGS that appear to be out of line before posting. COGS are accurate 99.5% of the time. Variation between finished goods book value and IN-F is minimal.
|