Welcome, Guest. Please
Login
.
05/07/25 at 16:22:00
News:
|
IS Tech Support
|
Evo~ERP
|
Evo Wiki
|
Forum
|
ISTech Support Forum
›
Evo-ERP and DBA Classic
›
Suggestions for Updates
‹
Previous topic
|
Next topic
›
Pages: 1
Machine on batch labor entry (Read 7227 times)
Karen Mason
Active Member
Ain't life grand!?!
Posts: 728
Gender:
Machine on batch labor entry
03/23/05 at 08:07:20
We would like to be able to specify the machine number when entering timecards during batch labor entry. This is needed for both direct & indirect labor (Equ.repair). Can this be added?
Entering in routings does not completely fill the bill, since we move operations between a variety of machines-depends on availability.
Thanks
Back to top
Karen Mason, Vice President
Bula Forge & Machine, Inc.
1-60# forgings, machining, & assembly
Cleveland, OH
Tel:216-252-7600 Fax:216-252-7601
www.bulaforge.com
EVO-ERP 09/16/09 SP2
IP Logged
Laura D. Oliver
Active Member
Posts: 985
Gender:
Re: Machine on batch labor entry
Reply #1 -
07/25/16 at 09:03:13
I guess not.... but it would be nice
Back to top
Laura D. Oliver
classic DBA since 1997
EVO on Amazon server as of 5-2022
DIXIE PRECISION INC.
Birmingham, Alabama
(205)- 841-8400
www.dixieprecision.com
IP Logged
Kelloggs
Active Member
Do crazy people know
they are crazy?
Posts: 784
Gender:
Re: Machine on batch labor entry
Reply #2 -
07/25/16 at 11:28:39
DBA/EVO has machines and work centers.
The labor could be enter as work center, in that way it does not matter what machine was actually used.
Just a thought
Kelloggs
Back to top
Evo ERP - 35 Users
Dumped MS Access like a hot potato (VB.Net rules!!!)
IP Logged
Laura D. Oliver
Active Member
Posts: 985
Gender:
Re: Machine on batch labor entry
Reply #3 -
05/16/22 at 06:47:15
WO-M Batch labor entry ---- specify machine?
The instructions from RO-D mention being able to add the machine number in WO-M. But we can't enter the machine # in WO-M because the machine number field is grayed out.
Maybe this has been fixed in a later update?
Thanks
Laura
Back to top
Laura D. Oliver
classic DBA since 1997
EVO on Amazon server as of 5-2022
DIXIE PRECISION INC.
Birmingham, Alabama
(205)- 841-8400
www.dixieprecision.com
IP Logged
prophet
Full Member
Posts: 217
Re: Machine on batch labor entry
Reply #4 -
05/17/22 at 13:02:06
Currently the only way you can enter a machine manually in that field is if you have the DATA COLLECTION defaults "Promt Run/Setup at clock in DC-A" set to Y and what you are entering in WO-M is for Setup Hours not Run hours. If you are entering an entry for for a WO and its for Run hours it will not let you enter a machine its view only in that field. Rather it will auto populate that field with whatever machine is setup for that sequence in the routing.
Back to top
IP Logged
Pages: 1
ISTech Support Forum
›
Evo-ERP and DBA Classic
›
Suggestions for Updates
‹
Previous topic
|
Next topic
›
Forum Jump:
-----------------------------
Evo-ERP and DBA Classic
-----------------------------
- User Polls
- EvoERP Flash Videos
- Problem Reports - Repeatable
- Problem Reports - Sporadic
- Manufacturing
- Items
- Sales
- Accounting
- System Manager
- Payroll
- Bar Code & Hand Held Interface
- RTM Reports & Editing
- Evo Menu & Evo-ERP
- Installation
=> Suggestions for Updates
- General DBA Topics
- DBA & Evo Local User Groups
- IS Tech Symposium & Training
- Program Offerings
- Jobs
- Source Code and Programming in TAS
- Web Storefront
-----------------------------
Windows & Network Issues
-----------------------------
- General Windows & Network Issues
-----------------------------
Pervasive SQL
-----------------------------
- PSQL General Issues
-----------------------------
Crystal Reports, ODBC & Access
-----------------------------
- Crystal Reports General Issues
- ODBC General Issues
- Access General Issues
-----------------------------
General
-----------------------------
- What is IS Tech Support?
- News
- Prizes for Active Forum Users
- EziJobz/Next Generation
- Fun Stuff
ISTech Support Forum
» Powered by
YaBB 2.1
!
YaBB
© 2000-2005. All Rights Reserved.