multiple jobs.... (Read 424 times)
ASM
Full Member
***


The Guitarman...

Posts: 142
Gender: male
multiple jobs....
07/06/05 at 06:06:38
 
Hi,
 Shouldn't the times in which 2 WO's were logged into at the same time be divided by 2 ? The example below shows were an employee was logged into more than 1 WO but the actual time was calculated for both jobs.
 
48 07/05/05 BISHOP, D              32000-  1    10    1    06:20:21  07:43:30    1.39  N/A     2
  48 07/05/05 BISHOP, D              31921-  1    10    1    06:20:21  07:43:30    1.39  N/A     2
 
Thanks
 
Jim P.
Back to top
 
 
  IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: multiple jobs....
Reply #1 - 07/06/05 at 06:29:29
 
Not sure which report that was from but some of hte reports show the total time but the cost is divided by the number of jobs.  Also, check SD-B Defaults, there is a setting for dividing cost by the number of jobs worked.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
jwoods
Browser
*




Posts: 30
Gender: male
Re: multiple jobs....
Reply #2 - 07/06/05 at 11:57:05
 
We also noticed today an employee's labor cost and overhead not being divided by the number of jobs being worked. Both SD-B and SD-Q Divide OH by number of jobs are set to yes.
Back to top
 
 

Evo-Erp
7 users + 3 DC Seats
7/26/13 SP1 update
Pervasive 11.31
  IP Logged