cathyh
Active Member
   

I used to be indecisive; now I'm not so sure......
Posts: 1210
Gender:
|
The labor costs are in the work center set up if you are using routings, or in the standard cost of the item if you are using a part number to enter labor. Work centers are set up in RO-C with labor cost for direct, variable and fixed overheads. The part number is an L type and costs are set up in IN-L-A or in IN-B, standard cost button.
|