Reporting labor when multi-tasking (Read 463 times)
muller2l
Browser
*


Git'em in Get'em
done Git'em out

Posts: 1
Reporting labor when multi-tasking
12/14/06 at 15:38:24
 
We are trying to determine which is the best way to report labor hours if an employee works two work orders at the same time. We have some work centers that run un-attended except for checking on the quality. So an employee will run one job full time and casually check the other job.  
So both jobs are running 8 hours each but the labor hours are only 8 hours total.  
We would like to get accurate job costing but we do not want to overstate the labor.
Back to top
 
 
  IP Logged
Dale
Member
**


New Swamp  =  New
Alligators

Posts: 62
Re: Reporting labor when multi-tasking
Reply #1 - 12/18/06 at 08:19:08
 
We have the same issue. We've begun using DC-C, with the employees keeping track of their own time. When we allow them to have multiple work orders open, the system posts all the elapsed time to all the jobs, rather than dividing it equally amongst them.
Back to top
 
 

Evo-ERP version 2007.1 Build 2/14/07
Pervasive PSQL v9 SP2
wisgolfer59@yahoo.com   IP Logged
Dale
Member
**


New Swamp  =  New
Alligators

Posts: 62
Re: Reporting labor when multi-tasking
Reply #2 - 01/09/07 at 07:05:22
 
Anyone have any ideas on this one?  
 
Lynn - what say ye?
Back to top
 
 

Evo-ERP version 2007.1 Build 2/14/07
Pervasive PSQL v9 SP2
wisgolfer59@yahoo.com   IP Logged
cathyh
Active Member
*****


I used to be
indecisive; now I'm
not so sure......

Posts: 1210
Gender: female
Re: Reporting labor when multi-tasking
Reply #3 - 01/09/07 at 07:38:35
 
There is a setting in Work Order defaults that asks if you want to divide labor by number of jobs-- I think that setting affects this, but I am not sure.
Back to top
 
 

Cathy Hamilton
Wing Inflatables, Inc.
EVO-ERP2008.1(20 users) w/IS Tech update 5/25/09 (as of 08/21/09)
Windows 2008 Server/client
Pervasive V10.1
Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: Reporting labor when multi-tasking
Reply #4 - 01/09/07 at 19:34:11
 
SD-B (WO Defaults) has the setting for Divide Labor by Number of Jobs and we added an SD-Q setting for Divide Overhead by Number of Jobs because it seemed silly to split the labor but not the overhead.  However, these options divide the total equally by the number of jobs worked.
 
It gets trickier when you want to split the labor disproportionally which is what I think the originator of this thread wants.  His operator may be running 2 jobs but it is 80/20, not 50/50.  
 
There is an option in SD-Q that says "Allow dec entry of # jobs worked?".  If you turn that on, you can play with the numbers to force the 80/20 split.  If that is really what you want to do, read the Help and then try some different options to see what results you get.