Lynn_Pantic
Administrator
   

evolution (n) - gradual change to a different form
Posts: 5663
|
SD-B (WO Defaults) has the setting for Divide Labor by Number of Jobs and we added an SD-Q setting for Divide Overhead by Number of Jobs because it seemed silly to split the labor but not the overhead. However, these options divide the total equally by the number of jobs worked. It gets trickier when you want to split the labor disproportionally which is what I think the originator of this thread wants. His operator may be running 2 jobs but it is 80/20, not 50/50. There is an option in SD-Q that says "Allow dec entry of # jobs worked?". If you turn that on, you can play with the numbers to force the 80/20 split. If that is really what you want to do, read the Help and then try some different options to see what results you get.
|