large WIP Variance on JC-M WIP Summary (Read 419 times)
kevind
Active Member
I was more than
willing to
"pony up",
how b'out U?
Posts: 634
Gender:
large WIP Variance on JC-M WIP Summary
02/20/07 at 08:15:07
I am trying to get a valid WIP Summary as of 12/31/06.
JC-M seems to work correctly for this with an as of date of 12/31/06.
I have one work order on the report that has a large WIP Variance.
This WO had 4 Partial receipts. How do I remove the WIP Variance on this report?
With it there, the Net WIP for this WO is negative.
Is the first paragraph of this post still valid?
http://www.istechforum.com/cgi-bin/YaBB.pl?board=DBA_ACCT;action=display;num=105 3529172;start=3#3
Back to top
Kevin Damke
Spectronics Corporation
ISTECH 2004.1 7/26/13 SP1 - 20 user
Evo-ERP Build 7/25/13 T7 -7i R6 - 3 user
(Prev version was 2004.1 10/24/12)
(All Patches Installed as of 7/26/13)
Pervasive 2000i SP4 - Crystal Reports V10
IP Logged
Lynn_Pantic
Administrator
evolution (n) -
gradual change to a
different form
Posts: 5663
Re: large WIP Variance on JC-M WIP Summary
Reply #1 -
02/20/07 at 17:29:30
The paragraph of the original post is still valid but the key is whether the Variance is valid. The WIP Variance will not appear until the work order is closed. If the WO was closed and the costs were not recalculated, it is possible the variance is in error. If so, reopening and rebuilding the costs and reclosing (as of the same date) will post a variance in the other direction reversing the effect of the first one.
Back to top
Lynn Pantic
IS Tech Support
lynn@istechsupport.com
IP Logged
kevind
Active Member
I was more than
willing to
"pony up",
how b'out U?
Posts: 634
Gender:
Re: large WIP Variance on JC-M WIP Summary
Reply #2 -
02/21/07 at 11:56:47
Lynn,
I have done the Re-opening and then closing two times now, ansewering Yes to Re-Calculate, and it still shows the variance. Any other ideas??
thanks
Back to top
Kevin Damke
Spectronics Corporation
ISTECH 2004.1 7/26/13 SP1 - 20 user
Evo-ERP Build 7/25/13 T7 -7i R6 - 3 user
(Prev version was 2004.1 10/24/12)
(All Patches Installed as of 7/26/13)
Pervasive 2000i SP4 - Crystal Reports V10
IP Logged
Lynn_Pantic
Administrator
evolution (n) -
gradual change to a
different form
Posts: 5663
Re: large WIP Variance on JC-M WIP Summary
Reply #3 -
02/21/07 at 12:00:58
Maybe it is legitimate. What was the total cost in and total finished production out?
Back to top
Lynn Pantic
IS Tech Support
lynn@istechsupport.com
IP Logged
Pages: 1
ISTech Support Forum
›
Evo-ERP and DBA Classic
›
Manufacturing
‹
Previous topic
|
Next topic
›
Forum Jump:
-----------------------------
Evo-ERP and DBA Classic
-----------------------------
- User Polls
- EvoERP Flash Videos
- Problem Reports - Repeatable
- Problem Reports - Sporadic
=> Manufacturing
- Items
- Sales
- Accounting
- System Manager
- Payroll
- Bar Code & Hand Held Interface
- RTM Reports & Editing
- Evo Menu & Evo-ERP
- Installation
- Suggestions for Updates
- General DBA Topics
- DBA & Evo Local User Groups
- IS Tech Symposium & Training
- Program Offerings
- Jobs
- Source Code and Programming in TAS
- Web Storefront
-----------------------------
Windows & Network Issues
-----------------------------
- General Windows & Network Issues
-----------------------------
Pervasive SQL
-----------------------------
- PSQL General Issues
-----------------------------
Crystal Reports, ODBC & Access
-----------------------------
- Crystal Reports General Issues
- ODBC General Issues
- Access General Issues
-----------------------------
General
-----------------------------
- What is IS Tech Support?
- News
- Prizes for Active Forum Users
- EziJobz/Next Generation
- Fun Stuff
ISTech Support Forum
» Powered by
YaBB 2.1
!
YaBB
© 2000-2005. All Rights Reserved.