Lynn_Pantic
Administrator
   

evolution (n) - gradual change to a different form
Posts: 5663
|
No, not at this time. We did develop the data structure in the Warehouse Control Bin files to manage the Lot and Serial Control detail but did not add that extra level of spaghetti to the programming code when it foirst came out. The thinking was to get the basic Bin Control working smoothly and get the inevitable kinks out first.
|