Welcome, Guest. Please
Login
.
05/10/25 at 15:08:32
News:
|
IS Tech Support
|
Evo~ERP
|
Evo Wiki
|
Forum
|
ISTech Support Forum
›
Evo-ERP and DBA Classic
›
Manufacturing
‹
Previous topic
|
Next topic
›
Pages: 1
Standard Cost (Read 1138 times)
Juan
Full Member
I love YaBB 1G -
SP1!
Posts: 105
Standard Cost
03/31/09 at 15:04:25
In the report Costed Bil Of Material at the end of the report , the report has the total for all the components, and it add Incremental Cost for Parent. What is incremental cost for parent?
Thx
Back to top
IP Logged
Lynn_Pantic
Administrator
evolution (n) -
gradual change to a
different form
Posts: 5663
Re: Standard Cost
Reply #1 -
03/31/09 at 18:12:15
Typically it will be Labor and Outside processing associated with the Routing for the parent part.
Back to top
Lynn Pantic
IS Tech Support
lynn@istechsupport.com
IP Logged
Juan
Full Member
I love YaBB 1G -
SP1!
Posts: 105
Re: Standard Cost
Reply #2 -
04/01/09 at 05:22:48
There's something wrong with the report I check a cable assembly type M we send the connectors and cable and pay $.85 to put it together, but the incremental cost is 0, why? and in others this cost is over stated
Thx
Back to top
IP Logged
Lynn_Pantic
Administrator
evolution (n) -
gradual change to a
different form
Posts: 5663
Re: Standard Cost
Reply #3 -
04/01/09 at 12:05:47
On a type M part, the Incremental cost would be what you pay for the outside service and it needs to be entered manually in IN-L-A or IN-B Standard Cost screen and rolled up and saved.
Back to top
Lynn Pantic
IS Tech Support
lynn@istechsupport.com
IP Logged
Juan
Full Member
I love YaBB 1G -
SP1!
Posts: 105
Re: Standard Cost
Reply #4 -
04/01/09 at 12:47:04
So were is the system getting the information that is on the report? we have not enter a cost for the outside on the items that I checked
Thx
Back to top
IP Logged
Lynn_Pantic
Administrator
evolution (n) -
gradual change to a
different form
Posts: 5663
Re: Standard Cost
Reply #5 -
04/01/09 at 13:34:03
If they are make from items, then somebody entered it. Unless the parts used to be a different type and have a routing. It has to be one or the other.
Back to top
Lynn Pantic
IS Tech Support
lynn@istechsupport.com
IP Logged
Juan
Full Member
I love YaBB 1G -
SP1!
Posts: 105
Re: Standard Cost
Reply #6 -
04/01/09 at 13:48:13
I know nobody entered, because that would have been me. The may have been type A, but we do not track labor. We do not have labor cost in DBA, only outside procesing
Thx
Back to top
IP Logged
Pages: 1
ISTech Support Forum
›
Evo-ERP and DBA Classic
›
Manufacturing
‹
Previous topic
|
Next topic
›
Forum Jump:
-----------------------------
Evo-ERP and DBA Classic
-----------------------------
- User Polls
- EvoERP Flash Videos
- Problem Reports - Repeatable
- Problem Reports - Sporadic
=> Manufacturing
- Items
- Sales
- Accounting
- System Manager
- Payroll
- Bar Code & Hand Held Interface
- RTM Reports & Editing
- Evo Menu & Evo-ERP
- Installation
- Suggestions for Updates
- General DBA Topics
- DBA & Evo Local User Groups
- IS Tech Symposium & Training
- Program Offerings
- Jobs
- Source Code and Programming in TAS
- Web Storefront
-----------------------------
Windows & Network Issues
-----------------------------
- General Windows & Network Issues
-----------------------------
Pervasive SQL
-----------------------------
- PSQL General Issues
-----------------------------
Crystal Reports, ODBC & Access
-----------------------------
- Crystal Reports General Issues
- ODBC General Issues
- Access General Issues
-----------------------------
General
-----------------------------
- What is IS Tech Support?
- News
- Prizes for Active Forum Users
- EziJobz/Next Generation
- Fun Stuff
ISTech Support Forum
» Powered by
YaBB 2.1
!
YaBB
© 2000-2005. All Rights Reserved.