GasGiant
|
You would need to change the UOH in BKICLOC and the last and average costs in BKICMSTR, and I'm not sure if the Book Value would be correct or not. Have a look at it in IN-A after the changes (this will fix UOH in the master files) and run UT-K-G on the item if needed. If standard cost for assemblies in which the item is used have been rolled up, you may want to rerun BM-G, as well.
|