Welcome, Guest. Please Login.
05/09/25 at 18:19:00
News:
Home Help Search Login


Pages: 1
Send Topic Print
PO-B & PO-R Can we use different default RTM? (Read 535 times)
TGerak
Full Member
***


DBA Classic Since
2000!

Posts: 186
PO-B & PO-R Can we use different default RTM?
09/28/11 at 12:39:25
 
Hoping to use PO-B to print a modified RTM as a PO shipping document for Outside Process PO's.  We also want to use a different modified PO as a receiving document (to hold in receiving until the parts come back).  It looks like both PO-B and PO-R the same thing and both use the same default RTM.  
 
Any way to change it other than keying over the RTM name each time?
Back to top
 
 
  IP Logged
TGerak
Full Member
***


DBA Classic Since
2000!

Posts: 186
Re: PO-B & PO-R Can we use different default RTM?
Reply #1 - 10/04/11 at 05:57:59
 
Should PO-B and PO-R be running the same program?
Back to top
 
 
  IP Logged
Pages: 1
Send Topic Print