Welcome, Guest. Please Login.
05/09/25 at 06:15:54
News:
Home Help Search Login


Pages: 1
Send Topic Print
Recalculating the cost of Labor (Read 928 times)
David Waldmann
Active Member
*****


Live to work, or
work to live?

Posts: 1919
Gender: male
Recalculating the cost of Labor
10/03/13 at 10:53:00
 
It seems that once you've been operating for a while you should be able to recalculate your cost of Labor and Overhead by using the numbers on your financial statement. For instance, our Absorbed Labor Variance has been consistently off in once direction for quite a while. Shouldn't I be able to use the Absorbed Labor and Absorbed Labor Variance amounts and adjust my Labor cost by that percentage?
 
For instance, say my Labor Cost is stated as $10/hr, and on my P&L the Absorbed Labor is -$100 and Absorbed Labor Variance is -$10. That would suggest to me that my Labor Cost should be 10% higher, or $11.
 
Is it that simple or am I missing something?
 
Thanks,
-d
Back to top
 
 

David N Waldmann
President
Vermont Hardwoods
Chester, VT

Evo-ERP, 5 user
IST Build: 3/4/19, patched 04/30/19
Pervasive v11.31
Server 2012 / Win10 x64
Crystal Reports v11
Email WWW   IP Logged
David Waldmann
Active Member
*****


Live to work, or
work to live?

Posts: 1919
Gender: male
Re: Recalculating the cost of Labor
Reply #1 - 10/03/13 at 11:06:47
 
Or, if I take the total of Absorbed Labor and the Absorbed Labor Variance and divide it by the number of hours in the period, wouldn't that also give me the proper (historical) hourly Labor cost? I think that's the same result as my first method, just a different way of doing the math, right?
Back to top
 
 

David N Waldmann
President
Vermont Hardwoods
Chester, VT

Evo-ERP, 5 user
IST Build: 3/4/19, patched 04/30/19
Pervasive v11.31
Server 2012 / Win10 x64
Crystal Reports v11
Email WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5663
Re: Recalculating the cost of Labor
Reply #2 - 10/03/13 at 11:15:50
 
Or take the actual direct labor divided by the number of hours.  The absorbed Labor Variance is not a system generated value.  It is something you determine by comparing Absorbed to Actual labor.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
David Waldmann
Active Member
*****


Live to work, or
work to live?

Posts: 1919
Gender: male
Re: Recalculating the cost of Labor
Reply #3 - 10/03/13 at 12:04:36
 
I was trying to keep the concept simple, but we actually use fully burdened labor cost so it gets a bit more complicated as you need to add up all the other costs. Plus, all labor is classified as Direct and then we take out Indirect Labor and Admin Labor. So there are a lot of non-system generated entries and I'm trying to make sure they're right.
 
I think I've got it now. I'm going to make the adjustments and then check again at the end of the quarter. The nice thing is that as long as your pricing is good none of this really matters except from a reporting perspective. Took my accountant a while to get comfortable with it though...
 
thanks,
-d
Back to top
 
 

David N Waldmann
President
Vermont Hardwoods
Chester, VT

Evo-ERP, 5 user
IST Build: 3/4/19, patched 04/30/19
Pervasive v11.31
Server 2012 / Win10 x64
Crystal Reports v11
Email WWW   IP Logged
Pages: 1
Send Topic Print