Crazy standard cost (Read 872 times)
shadowcaster
Active Member
*****


I'm not here because
I know what to do.

Posts: 678
Gender: male
Crazy standard cost
06/11/14 at 10:31:42
 
I have a simple type A item
 
cost of part 130.00
outside processing  7.50
 
its adding up to  
 
267 material and freight
274 total standard cost
 
can anyone tell me what is going on here
 
 
HELP !
 
I need to quote a new job and my costs are crazy
 
Back to top
 
 
WWW   IP Logged
David Waldmann
Active Member
*****


Live to work, or
work to live?

Posts: 1919
Gender: male
Re: Crazy standard cost
Reply #1 - 06/11/14 at 13:15:21
 
A little more info needed, I think?
 
I assume you've double checked the BOM and Routing.
 
Where are the "cost of part and outside processing" coming from? i.e. where are they entered or on what report/screen do you see them?
 
Where are the "adding up to" numbers coming from? i.e. on what report/screen do you see them?
Back to top
 
 

David N Waldmann
President
Vermont Hardwoods
Chester, VT

Evo-ERP, 5 user
IST Build: 3/4/19, patched 04/30/19
Pervasive v11.31
Server 2012 / Win10 x64
Crystal Reports v11
Email WWW   IP Logged
shadowcaster
Active Member
*****


I'm not here because
I know what to do.

Posts: 678
Gender: male
Re: Crazy standard cost
Reply #2 - 06/11/14 at 13:39:59
 
ok so lynn pointed me in the right direction
 
there was cost in the material field  like these were type R items
 
still don't know how it got there because these are all type A items that have the issue
 
and there seem to be many
 
its like a cost roll up went wild on some items
 
re rolling wont fix it
 
I had to use UT-A fix std to zero out the offending material cost.
 
now I need to somehow find all the items that have this issue
any ideas ?
 
Back to top
 
 
WWW   IP Logged
David Waldmann
Active Member
*****


Live to work, or
work to live?

Posts: 1919
Gender: male
Re: Crazy standard cost
Reply #3 - 06/11/14 at 13:49:24
 
Evo is not very restrictive on these kind of issues.
 
My guess is that either the item was copied from a type R part, or was a type R part at one time.  
 
Do this to see what Evo erroneously allows: (all in IN-B) change a part from type A/F to R. Now enter a material cost, roll up cost and save. Change part type back to A/F - still has a "this level material cost". Hint - you can fix the problem that way - change them to R, set Material Cost to 0 and change back to A.
 
Should be easy enough to create a report for all A/F parts with a "This level material cost" of >0.
Back to top
 
 

David N Waldmann
President
Vermont Hardwoods
Chester, VT

Evo-ERP, 5 user
IST Build: 3/4/19, patched 04/30/19
Pervasive v11.31
Server 2012 / Win10 x64
Crystal Reports v11
Email WWW   IP Logged
shadowcaster
Active Member
*****


I'm not here because
I know what to do.

Posts: 678
Gender: male
Re: Crazy standard cost
Reply #4 - 06/11/14 at 14:58:11
 
Using access to check type A items where MTIC_PROD_RCOST_2 >0
 
found 183 of them
 
they all look like they came from an import we did many many years ago
 
that's my guess anyway
 
on many the error was small but today they added up to over 10k on one bom
 
I was in a panic because I need to get a quote done and there were a bunch of these items on 1 bom and I was thinking something blew up.
 
all should be well after I use my new jitbit macro recorder to fix them all