Welcome, Guest. Please Login.
05/10/25 at 21:45:41
News:
Home Help Search Login


Pages: 1
Send Topic Print
Change Cost (Read 741 times)
GoodNatureProducts
Browser
*


I Love EvoERP!

Posts: 1
Change Cost
05/11/15 at 10:51:19
 
I have a part that was bought from the outside and we have a $$ amount in the outside proc field, we now just buy the material and assemble the part. My Material cost field is correct but I cant make the outside proc = 0.  
 
It will not let me change it in IN-B or IN-L-A  
 
thanks
Back to top
 
 
  IP Logged
Vman
Senior Member
****


If it ain't broke,
don't fix it

Posts: 460
Gender: male
Re: Change Cost
Reply #1 - 05/12/15 at 09:43:11
 
Try UT-A FIXSTD.RUN.
Back to top
 
 

EVO-ERP 2022.2
Build 4/22/22
Actican Zen V14 SP2 Workgroup
Win7 64-bit and Win10 Pro
WWW   IP Logged
Pages: 1
Send Topic Print