Lynn_Pantic
Administrator
   

evolution (n) - gradual change to a different form
Posts: 5663
|
The first place it looks is a Verbal RFQ (PO-F) linked to the Estimate and flagged Y to use in the estimate. Next, if none is found, it looks at material costs as entered in ES-H which is used for any estimate that uses a given material. Finally, if none is found there, it uses the standard cost.
|