Routing cost actual cost power tool needed (Read 811 times)
shadowcaster
Active Member
*****


I'm not here because
I know what to do.

Posts: 678
Gender: male
Routing cost actual cost power tool needed
02/18/04 at 15:20:41
 
Ok heres what I need to do
 
I have over 3000 of type A items many with standard cost that are not in tune with actual cost  I need to generate a report /spreadsheet that shows part number and the actual cost of each routing and the portion of the standard cost in that routing. So I know what routings to correct and by how much.
 
Is there such a thing, could I do this in Access?  Where is the job cost data stored?
 
Its getting old having to do a job cost on each item and try to back figure dollars, time ect. to correct the standard cost on each item. I need a POWER Tool for this job.
 
JW
 
Back to top
 
 
WWW   IP Logged
Lynn_Pantic
Administrator
*****


evolution (n) -
gradual change to a
different form

Posts: 5681
Re: Routing cost actual cost power tool needed
Reply #1 - 02/18/04 at 18:34:06
 
Is it the Labor time standards that need to be updated?  JC-H (IS Tech Version) has the ability to update the Routing Standards based on the actual labor reported.   See if that will help.
Back to top
 
 

Lynn Pantic
IS Tech Support
lynn@istechsupport.com
Email   IP Logged
shadowcaster
Active Member
*****


I'm not here because
I know what to do.

Posts: 678
Gender: male
Re: Routing cost actual cost power tool needed
Reply #2 - 02/19/04 at 13:41:06
 
Thanks That's close
Very nice too I didn't know that was in there.
 
If the part number was repeated on the line with each record it would be mucho better because I could them import the data into access and calculate what ones are realistic based on the existing standard and what ones have junk in them.
 
is there a source  I can lookat for that report ?  
so I can see where the data comes from ?
 
then I can just ODBC it into access
 
JW
Back to top
 
 
WWW   IP Logged
aricon
Active Member
*****


Systems
Consulting-See
website for
products!

Posts: 1283
Gender: male
Re: Routing cost actual cost power tool needed
Reply #3 - 02/19/04 at 13:54:14
 
Actual labor is in WOLABOR (or WOHLABOR if you have archived WOs) and the standards are in ROUTING.
Back to top
 
 

Sincerely,

Lorne Rogers
President
Aria Consulting & Implementers Ltd.
Phone: (780) 471-1430
Fax: (780) 471-4918
E-mail: lrogers@ariaconsulting.net
Email WWW   IP Logged
shadowcaster
Active Member
*****


I'm not here because
I know what to do.

Posts: 678
Gender: male
Re: Routing cost actual cost power tool needed
Reply #4 - 02/19/04 at 14:44:08
 
Lorne
 
Thanks for pointing me in the right direction.
I get lost in these tables  
 
Dam it  Jim I'm a surgeon not a brick layer.  (Star trek Reference)
 
 
JW
 
Back to top
 
 
WWW   IP Logged
aricon
Active Member
*****


Systems
Consulting-See
website for
products!

Posts: 1283
Gender: male
Re: Routing cost actual cost power tool needed
Reply #5 - 02/19/04 at 15:39:29
 
Can't remember the field name in ROUTING, but the labor field in WOLABOR is EST_LAB for estimated, and ACT_LAB for actual reported.
Back to top
 
 

Sincerely,

Lorne Rogers
President
Aria Consulting & Implementers Ltd.
Phone: (780) 471-1430
Fax: (780) 471-4918
E-mail: lrogers@ariaconsulting.net
Email WWW   IP Logged