RKyle
Browser

I Love EvoERP!
Posts: 1
|
Before I roll up standard costs, I would like to know ahead of time what changes will be made during the roll. Is there a report, or a way to configure an existing report to see (before actually rolling standard costs): Before and After what the overall BOM cost will be? What specifically are the items that are affecting change? Thanks Lynn! robert
|